Launcher, packaging and logistics / LOGI: Simca Logistics (free overlay on Interchange/CONN): Load Board, Dispatch,
What does “Proof via short offline code” depend on?
Planned: listed in the catalog, not built C0499
Proof via short offline code depends on Simca Logistics overlay root. By itself it covers: Typed code confirmation when camera/radio unavailable. These are catalog links between planned items in “Waybill, proof of delivery and handshake in jobs”.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.