Hardware, platform and safety / Offline-first architecture
What is the plan for “Multi-register shops”, thinking about leader device fails?
Planned: listed in the catalog, not built C0209
Several tills sharing one database or syncing peer to peer. Plan for: leader device fails; split network; duplicate numbers. In the catalog it is a plan and nothing is built.
How to read this
The tag above says how real the answer is. Answers describe the plan in the repository and design documents. No app is released. Where an answer touches tax or law, treat it as a theme to verify with a qualified local adviser.
More in Offline-first architecture
- What goes wrong with “Sync between devices” in a shop, considering conflicts?
- Where does “Time and ordering” fit in Simca, with a focus on device clock jumps?
- Is “Crash and power-cut safety” supported today, considering printer prints but sale lost?
- See it in context with the whole topic
- Search all answers