Design stage: there is no released app yet. This site separates what exists in the repository from what is planned. See status

Hardware, platform and safety

FAIL: Reliability, Failsafes & Edge Pathways

Questions about the Reliability, Failsafes & Edge Pathways module of the catalog.

Status labels: Built in the repository (checked files or developer tooling, not an app feature) Designed in a document, no code yet Planned: listed in the catalog, not built Not decided Not in the catalog yet (a gap) No claim made

Is “Single-writer queue” planned for the Reliability, Failsafes & Edge Pathways module?

Planned C0402

Yes: FAIL-0003, Single-writer queue, is a core item under “Storage durability”. Its description reads: Serialize writes to avoid SQLITE_BUSY. This is a plan only.

Open this answer on its own page

Can I use “Disk-full graceful handling” today?

Planned C0403

No: there is no released app. FAIL-0016 (Disk-full graceful handling), filed under “Storage durability”, is described as: Block new sales safely, never corrupt.

Open this answer on its own page

Can I use “Unknown-outcome payment resolution” today?

Planned C0404

No: there is no released app. FAIL-0023 (Unknown-outcome payment resolution), filed under “Crash & power loss”, is described as: Reconcile when app died during digital/card payment.

Open this answer on its own page

Is “KDS disconnect alert” planned for the Reliability, Failsafes & Edge Pathways module?

Planned C0405

Yes: FAIL-0047, KDS disconnect alert, is a core item under “Hardware faults”. Its description reads: Waiter notified, fallback to print. This is a plan only.

Open this answer on its own page

Which tier includes “Hub unreachable behavior”?

Planned C0406

Hub unreachable behavior (FAIL-0058) is assigned to both Lite and Pro. Section “Network”: Register continues independently. Tier names are catalog labels, and no prices are published.

Open this answer on its own page

Why would a shop need “Customer name/DNI typo post-issue”?

Planned C0407

For Customer name/DNI typo post-issue (FAIL-0086) the catalog says: Within 10 business days NC exception. It is core priority within “Money & data edge cases” and sits in both Lite and Pro. It is not a feature yet.

Open this answer on its own page

What does “Self-diagnostic health screen” depend on?

Planned C0408

Self-diagnostic health screen depends on SQLite WAL mode with synchronous=FULL for money tables. By itself it covers: Check DB, disk, clock, printer, backup, SUNAT queue, license. These are catalog links between planned items in “Money & data edge cases”.

Open this answer on its own page

Which tier includes “Item price changed while ticket open”?

Planned C0409

Item price changed while ticket open (FAIL-0119) is assigned to both Lite and Pro. Section “Additional edge pathways”: Lock price at order time with manager-approved update. Tier names are catalog labels, and no prices are published.

Open this answer on its own page

How important is “Document number consumed by crash before commit” in the catalog?

Planned C0410

Document number consumed by crash before commit carries core priority in Reliability, Failsafes & Edge Pathways, section “Additional edge pathways”. Description: Gap-recovery by void/baja policy. Priority is only a planning label.

Open this answer on its own page

What does the “Power cut for hours (apagón) in market” item cover?

Planned C0411

Power cut for hours (apagón) in market is item FAIL-0138 in the “Additional edge pathways” section of Reliability, Failsafes & Edge Pathways. In the catalog it covers: Phone/battery-only mode, paper fallback book, later reconcile. Nothing is built.

Open this answer on its own page

How important is “Dual-write journal (event log file)” in the catalog?

Planned C0412

Dual-write journal (event log file) carries standard priority in Reliability, Failsafes & Edge Pathways, section “Storage durability”. Description: Secondary append-only transaction journal. Priority is only a planning label.

Open this answer on its own page

What does the “Cashier gives wrong change discovered at close” item cover?

Planned C0413

Cashier gives wrong change discovered at close is item FAIL-0116 in the “Additional edge pathways” section of Reliability, Failsafes & Edge Pathways. In the catalog it covers: Variance attribution workflow. Nothing is built.

Open this answer on its own page

What does the “Sale to non-domiciled buyer” item cover?

Planned C0414

Sale to non-domiciled buyer is item FAIL-0130 in the “Additional edge pathways” section of Reliability, Failsafes & Edge Pathways. In the catalog it covers: Document type 0/7 and exception handling. Nothing is built.

Open this answer on its own page

Does “Shared phone used by multiple cashiers” work without internet?

Planned C0415

The catalog marks it as always offline. For Shared phone used by multiple cashiers (FAIL-0141) the catalog text is: Fast PIN switch without losing cart. Under “Additional edge pathways”, and not built.

Open this answer on its own page

What does the “Tip received via Yape to personal phone” item cover?

Planned C0416

Tip received via Yape to personal phone is item FAIL-0152 in the “Additional edge pathways” section of Reliability, Failsafes & Edge Pathways. In the catalog it covers: Record as tip without business revenue. Nothing is built.

Open this answer on its own page